This is a shooting schedule for the filming of our opening titled sequence. The opening sequence was done by the other two members of my group -- Tegan and Adrianna. The shooting schedule is very important for the crew members for them in order to be able to not disorganize at any point of the filming and it also breaks down everything.
Shooting Schedule for The Elevator scene- Adrianna, Tegan and Anna
Date | Time | Set/location | Description | Crew needed | Cast needed | Any notes |
14.05.21 | 8:30 | Filming studio | Rehearsal and Set-Up
| Full crew (Tegan Adrianna, Anna) | Full Cast (Jake and Liv) | Elevator not available |
14.05.21 | 10:00 | On set- Elevator in school | Starting to film, order is the same as in the shot list | Full crew (Tegan Adrianna, Anna) | Full Cast (Jake and Liv) | FIlm everything possible except Liv’s scenes alone at the beginning |
14.05.21 | 12:30 | Lunch (?) | Hour or so break to eat | Full crew (Tegan Adrianna, Anna) | Full Cast (Jake and Liv) | The kitchen staff use the elevator for lunch |
14.05.21 | 2:00-4:00 | On set- Elevator in school | Continue shooting whatever remaining scenes we may have | Full crew (Tegan Adrianna, Anna) | Full Cast (Jake and Liv) | We only have distinct hours we are allied to use the elevator |
14.05.21 | 4:00- 5:00 | On set- Outside the Elevator | Only filming inserts which come before/after main scene | Full crew (Tegan Adrianna, Anna) | Just Liv | These will be filmed outside |
No comments:
Post a Comment